Skip to content

Practical guide · Property law

New-build defects in Spain: LOE warranties, deadlines and who to claim against

Bought a new home in Spain with damp, cracks or other defects? Learn how the one-, three- and ten-year periods work, the separate two-year claim limit, the developer and other parties, and what evidence to keep.

Sources checked ·

1. The warranty period is not the deadline for bringing every claim

Do not wait for the developer to decide whether it will repair a defect. Spain’s Building Regulation Act (Ley de Ordenación de la Edificación, LOE) distinguishes the period within which the relevant material damage must arise from the limitation period for enforcing that statutory liability. The developer’s obligations as seller under your contract may need a separate assessment.

This guide addresses buildings falling within article 2 LOE, including new construction and certain substantial works on existing buildings. Not every small domestic repair is covered. If you purchased a resale property, see our guide to defects discovered after purchase. For an incomplete or defective domestic renovation, our renovation claims guide (Spanish) addresses the direct contract with the contractor.

2. What the three statutory liability periods actually cover

Under article 17 LOE, the following periods concern material damage to a building, measured from acceptance of the works without reservations or rectification of the relevant reservations, as applicable:

Type of damagePeriod
Defective execution of finishing work1 year
Construction or installation defects affecting habitability3 years
Structural defects compromising mechanical resistance and stability10 years

The builder is responsible for defective finishing work within the one-year period. A leak that compromises habitability may fall within the three-year period, but the cause and consequences matter. A superficial crack does not qualify for the structural category merely because it looks alarming; obtain a suitable technical assessment.

The second additional provision of the LOE requires the structural ten-year guarantee for buildings intended mainly for residential use, subject to exceptions, including certain individual self-build homes. The one- and three-year legal liability periods do not necessarily mean that all buildings have corresponding mandatory insurance policies. Ask for the actual guarantees and insurance, then check coverage and claims requirements.

3. Acceptance of the building, damage and the two-year claim period

Acceptance is the builder’s delivery to the developer and the latter’s acceptance. It need not coincide with your purchase deed or handover of keys. Article 6 regulates the acceptance record, reservations and rectification, and when tacit acceptance may occur.

Illustration only: the works were accepted without reservations on 12 June 2024. The reference dates for the three damage periods are:

TypeReference date
Finishing · one year12/06/2025
Habitability · three years12/06/2027
Structural · ten years12/06/2034

If material damage affecting habitability occurs and is sufficiently known on 3 November 2025, within the relevant three-year period, the article 18.1 LOE statutory liability action is subject to a separate two-year limitation period. On the stated assumptions, with no interruption, the reference deadline would be 3 November 2027. Do not treat this illustration as a deadline calculator; actual facts, knowledge, the relevant defendant and interruption must be checked.

STS 391/2022 (Spanish case note) concerned established defects that continued to manifest themselves. Later expert disagreement did not restart limitation. By contrast, STS 602/2021 (Spanish case note) concerned evolving fissures that had to be monitored before their extent could be understood. The Supreme Court sent the latter case back for determination of the merits because the claim was not time-barred. A later report in itself does not postpone the time limit.

4. Which parties may be responsible?

  • Developer (promotor): statutory joint liability with responsible building participants towards purchasers within article 17.3 LOE, and potentially separate contractual duties if it sold the home.
  • Builder (constructor): responsibility related to execution of the works, including the persons and subcontracted works for which it is responsible.
  • Designer, architect and technical architect: check their specific commission, project, supervision and execution duties in relation to the cause of the damage.
  • Insurer or guarantor: check the actual policy, beneficiary and covered risk. A structural policy is not cover for all imperfections.

In STS 1388/2025 (Spanish case note), an owners’ community brought proceedings against the developer; other professionals were called into the proceedings at the developer’s request but the community expressly declined to extend its claim to them. A later claim against them was time-barred. Merely knowing of the proceedings did not interrupt limitation.

STS 331/2020 (Spanish case note) reached a different result on the facts: the broadly framed complaint, arranged joint visit and technical report demonstrated that those particular professionals had actually been called upon to address the damage. Do not rely on that factual exception. Identify and notify each relevant responsible party using a method that records the content, date and receipt. See article 1973 of the Spanish Civil Code.

5. Contract claims against the seller and claims by the owners’ community

The LOE statutory action and genuine breach of contract can be distinct. In STS 710/2018 (Spanish case note), the Court held that the contractual claim against the developer-seller could be considered independently and returned the dispute to the lower court for decision. It did not grant a general indemnity or revive expired rights. Check the purchase contract, specification, plans, promises, dates and applicable limitation period.

For personal actions with no special limitation period under common Spanish civil law, article 1964.2 CC provides five years from the date the obligation can be enforced. Territorial civil law, transitional rules and the particular remedy can change the position. There is no double recovery for the same loss.

STS 756/2014 (Spanish case note) also recognised the president of a homeowners’ community’s standing to claim for certain defects affecting individual apartments, where a wide community resolution authorised action for community benefit and there was no express objection. Collect the resolution and identify any individual losses or objections; the president’s authority is not unlimited.

6. What to do now and which evidence to keep

  1. Ask for the building book, the acceptance record, any reservations and rectification, the final works certificate and the policies or guarantees. See article 7 LOE.
  2. Date photographs and identify the specific area, first symptoms and previous communications. If safety is at risk, take proportionate measures and document the urgency.
  3. Obtain an independent expert report where necessary, identifying the cause, progression, suitable remedial work and cost. It does not itself decide the legal deadline or parties.
  4. Communicate the complaint and requested remedy to the relevant parties and preserve proof of content and receipt. The editable initial defect notice (Spanish) is a starting point; adapt it for the particular facts and each recipient.
  5. Assess whether pre-action negotiation (MASC) is required under Organic Law 1/2025, article 5. Article 7 governs impact on limitation and expiry periods. A period to meet the procedural requirement does not automatically extend a shorter substantive claim deadline.

Keep acknowledgements, proposals, inspection results and invoices. Before signing any satisfaction, settlement or release, identify which defects have actually been repaired and what remains. If the developer is insolvent or there is an immediate deadline, flag it promptly.

Frequently asked questions

Does every defect have a ten-year warranty?

No. The LOE separates finishing, habitability and structural damage. The ten-year category concerns qualifying structural damage that directly compromises mechanical resistance and stability.

Does the period start when I receive the keys?

Not necessarily. The LOE refers to acceptance of the works by the developer without reservations or rectification of the relevant reservations. Obtain the actual acceptance record.

Is it enough to complain to the developer?

Not if the intention is to protect claims against every relevant party. The Supreme Court’s 1388/2025 decision illustrates why notice to the developer alone is insufficient.

Do recurring damp patches restart limitation?

Not automatically. A known and established defect is different from genuinely progressive damage that could not yet be assessed.

Can I claim under the purchase contract if LOE liability is time-barred?

Possibly, where a separate enforceable contractual action exists against a contracting party and remains within its own limitation period. The facts and contract must be examined.

How we can help

Pérez & Burgos can review the purchase, evidence, applicable dates, potentially responsible parties and the appropriate way to pursue the defects. Request an initial assessment free of charge; scope, lawyer and fees will be confirmed before engagement.

The initial assessment is free. It does not instruct the firm or stop any legal deadline.

Useful next steps

Sources and judgments consulted

Sources checked ·